- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Reported events
20.11.17 - Ascó II (Tarragona) - INES 0 (Provisional)
20.11.17 - Ascó II (Tarragona) - INES 0 (Provisional).pdf
Version 1.1 Approved- Document Type
- Basic Document
- Extension
- Size
- 162 KB
- Modified
- 20/11/17, 19:48 by Natalia Muñoz
- Created
- 20/11/17, 16:00 by Natalia Muñoz
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- ASCÓ II
- Tags
- isn 24h
- Description
- El titular de la central nuclear Ascó ha comunicado al Consejo de Seguridad Nuclear (CSN), siguiendo el procedimiento establecido, que durante las actividades de carga de combustible correspondientes a la 24° recarga, se llevó a cabo una desconexión manual del secuenciador de Pérdida de Potencia Exterior (PPE) durante dos minutos.
- Categories
- Sucesos Suceso 24 H Instalaciones nucleares Ascó 2017
Ocurrence Date
20/11/17, 15:00
Publish Date
20/11/17, 15:00
2017-11-20T17:44:25Z
nmm
2017-11-20T17:44:25Z
application/pdf
2017-11-20T17:44:25Z
nmm
2017-11-20T17:44:25Z
2017-11-20T17:44:25Z
-
Version 1.1By Natalia Muñoz, on 20/11/17, 19:48No Change Log
-
Version 1.0By Natalia Muñoz, on 20/11/17, 19:47No Change Log