- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Inspection reports
Published 19/10/18
Inspección para la revisión del proceso de análisis de nueva normativa (NN) de la Central
Inspección para la revisión del proceso de análisis de nueva normativa (NN) de la Central.pdf
Version 1.1 Approved- Document Type
- Basic Document
- Extension
- Size
- 2.8 MB
- Modified
- 28/03/19, 14:17 by Israel Adriel Lampertti
- Created
- 19/10/18, 02:00 by Israel Adriel Lampertti
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- Central nuclear de Almaraz
- Description
- AIN/AL0/1153/18 - Acta de Inspección - Almaraz
- Categories
- Inspección Almaraz 2018
Ocurrence Date
19/10/18, 00:00
Publish Date
19/10/18, 00:00
-
Version 1.1By Lourdes Castrillo Aguado, on 28/03/19, 14:17No Change Log
-
Version 1.0By Israel Adriel Lampertti, on 27/03/19, 11:14No Change Log