Reported events
03.07.14 - Almaraz II (Cáceres) - INES 0
03.07.14 - Almaraz II (Cáceres) - INES 0.pdf
Version 1.2 Approved- Document Type
- Basic Document
- Extension
- Size
- 83 KB
- Modified
- 17/02/15, 12:12 by Test Test
- Created
- 03/07/14, 03:00 by Test Test
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- ALMARAZ II
- Tags
- parada turbina isn 24h suministro alternador potencia
- Description
- A raíz de la información suministrada por el fabricante de los reguladores de algunas válvulas neumáticas y tras la evaluación llevada a cabo por el área de Ingeniería de la central, se ha determinado que, en un hipotético caso de sismo o pérdida de alimentación eléctrica exterior, la capacidad real de dichos equipos, no podría garantizar el suministro de aire requerido
- Categories
- Sucesos Notificados Suceso 24 H Almaraz Sucesos Notificados 2014
Ocurrence Date
03/07/14, 01:00
Publish Date
03/07/14, 01:00
2014-11-05T10:20:34Z
2014-10-28T10:22:15Z
PARADA SUMINISTRO ALTERNADOR TURBINA POTENCIA ISN 24H VÁLVULAS
application/pdf
2014-11-05T10:20:34Z
PARADA SUMINISTRO ALTERNADOR TURBINA POTENCIA ISN 24H VÁLVULAS
.
2014-10-28T10:22:15Z
2014-11-05T10:20:34Z
-
Version 1.2By Natalia Muñóz, on 17/02/15, 12:12No Change Log
-
Version 1.1By Natalia Muñóz, on 09/02/15, 16:19No Change Log
-
Version 1.0By Test Test, on 20/11/14, 08:22No Change Log