- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Inspection reports
Published 05/07/18
Inspección para comprobar los aspectos del programa general de inspección en servicio
Inspección para comprobar los aspectos del programa general de inspección en servicio.pdf
Version 1.0 Approved- Document Type
- Basic Document
- Extension
- Size
- 1 MB
- Modified
- 30/01/19, 13:33 by Lourdes Castrillo Aguado
- Created
- 05/07/18, 02:00 by Lourdes Castrillo Aguado
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- Central nuclear de Ascó
- Description
- AIN/AS0/1159/18 - Acta de Inspección - Ascó
- Categories
- Inspección Ascó 2018
Ocurrence Date
05/07/18, 00:00
Publish Date
05/07/18, 00:00
2019-01-30T07:46:55Z
2018-08-14T07:39:48Z
application/pdf
2019-01-30T07:46:55Z
2018-08-14T07:39:48Z
2019-01-30T07:46:55Z
-
Version 1.0By Lourdes Castrillo Aguado, on 30/01/19, 13:33No Change Log