- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Inspection reports
Published 19/10/18
Inspección sobre efectividad del mantenimiento (bienal) 2018
Inspección sobre efectividad del mantenimiento (bienal) 2018.pdf
Version 1.0 Approved- Document Type
- Basic Document
- Extension
- Size
- 2.4 MB
- Modified
- 29/03/19, 10:44 by Israel Adriel Lampertti
- Created
- 19/10/18, 02:00 by Israel Adriel Lampertti
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- Central nuclear de Ascó
- Description
- AIN/AS0/1164/18 - Acta de Inspección - Ascó
- Categories
- Inspección Ascó 2018
Ocurrence Date
19/10/18, 00:00
Publish Date
19/10/18, 00:00
-
Version 1.0By Israel Adriel Lampertti, on 29/03/19, 10:44No Change Log