- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Inspection reports
Published 31/12/18
Inspección relativa al Sistema Integrado de Supervisión de Centrales (SISC)
Inspección relativa al Sistema Integrado de Supervisión de Centrales (SISC).pdf
Version 1.0 Approved- Document Type
- Basic Document
- Extension
- Size
- 10.4 MB
- Modified
- 29/03/19, 11:00 by Israel Adriel Lampertti
- Created
- 31/12/18, 01:00 by Israel Adriel Lampertti
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- Central nuclear de Ascó
- Description
- AIN/AS0/1171/18 - Acta de Inspección - Ascó
- Categories
- Inspección Ascó 2018
Ocurrence Date
31/12/18, 00:00
Publish Date
31/12/18, 00:00
-
Version 1.0By Israel Adriel Lampertti, on 29/03/19, 11:00No Change Log