Reported events
23.12.16- Ascó (Tarragona)- INES 0
23.12.16- Ascó (Tarragona)- INES 0.pdf
Version 1.1 Approved- Document Type
- Basic Document
- Extension
- Size
- 156 KB
- Modified
- 23/12/16, 10:24 by Adriana Scialdone
- Created
- 22/12/16, 22:00 by Adriana Scialdone
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- ASCÓ I
- Tags
- isn 24h
- Description
- El titular de la central nuclear de Ascó I ha informado al CSN, siguiendo los procedimientos reglamentarios, que el día 21/12/2016, durante un control de verificación de fuentes radiactivas selladas, se detectó que no se había realizado la prueba de estanqueidad semestral en una de ellas que se encuentra actualmente en uso. Esto supone un incumplimiento de un requisito de vigilancia de las Especificaciones Técnicas de Funcionamiento (ETF).
- Categories
- Sucesos Suceso 24 H Instalaciones nucleares Ascó 2016
Ocurrence Date
22/12/16, 21:00
Publish Date
22/12/16, 21:00
2016-12-23T08:14:57Z
nmm
2016-12-23T08:14:57Z
application/pdf
2016-12-23T08:14:57Z
nmm
2016-12-23T08:14:57Z
2016-12-23T08:14:57Z
-
Version 1.1By Adriana Scialdone, on 23/12/16, 10:24No Change Log
-
Version 1.0By Adriana Scialdone, on 23/12/16, 10:23No Change Log