- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Reported events
27.01.17 - Ascó II (Tarragona) - INES 0 (Provisional)
27.01.17 - Ascó II (Tarragona) - INES 0 (Provisional).pdf
Version 1.0 Approved- Document Type
- Basic Document
- Extension
- Size
- 176 KB
- Modified
- 27/01/17, 18:57 by Natalia Muñoz
- Created
- 27/01/17, 22:00 by Natalia Muñoz
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- ASCÓ II
- Tags
- isn 24h
- Description
- El titular de la central ha comunicado al Consejo de Seguridad Nuclear (CSN) que en el proceso de revisión de las Especificaciones Técnicas de Funcionamiento (ETF) para su adaptación a las Especificaciones Técnicas mejoradas, que se está llevando a cabo en la central, se ha identificado que la carga aplicada durante las pruebas de vigilancia a los grupos de baterías del sistema de corriente continua para cargas relacionadas con la seguridad es inferior a los parámetros especificados (battery service test) en el Estudio de Seguridad (ES).
- Categories
- Suceso 24 H Ascó 2017
Ocurrence Date
27/01/17, 21:00
Publish Date
27/01/17, 21:00
2017-01-27T16:45:23Z
nmm
2017-01-27T16:45:23Z
application/pdf
2017-01-27T16:45:23Z
nmm
2017-01-27T16:45:23Z
2017-01-27T16:45:23Z
-
Version 1.0By Natalia Muñoz, on 27/01/17, 18:57No Change Log