- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Reported events
23.05.17 - Ascó I (Tarragona) - INES 0 (provisional)
23.05.17 - Ascó I (Tarragona) - INES 0 (provisional).pdf
Version 1.2 Approved- Document Type
- Basic Document
- Extension
- Size
- 209 KB
- Modified
- 23/05/17, 09:39 by Natalia Muñoz
- Created
- 23/05/17, 19:00 by Natalia Muñoz
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- ASCÓ I
- Tags
- isn 1h
- Description
- La central nuclear Ascó I (Tarragona) ha notificado a las 2:12h., al Consejo de Seguridad Nuclear (CSN) una alerta de emergencia conforme a los requerimientos establecidos en su Plan de Emergencia Interior (PEI), activándose la Organización de Respuesta ante Emergencias del Consejo de Seguridad Nuclear (CSN) debido a un incendio de duración superior a 10 minutos.
- Categories
- Sucesos Suceso 1 H Instalaciones nucleares Ascó 2017
Ocurrence Date
23/05/17, 17:00
Publish Date
23/05/17, 17:00
2017-05-23T05:37:41Z
nmm
2017-05-23T05:37:41Z
application/pdf
2017-05-23T05:37:41Z
nmm
2017-05-23T05:37:41Z
2017-05-23T05:37:41Z
-
Version 1.2By Natalia Muñoz, on 23/05/17, 09:39No Change Log
-
Version 1.1By Natalia Muñoz, on 23/05/17, 06:42No Change Log
-
Version 1.0By Natalia Muñoz, on 23/05/17, 06:34No Change Log