- Overview
- What we do for nuclear safety
- Licensing of facilities
- Personnel licenses
- Supervision and control. Inspections
- Nuclear power plants in Spain
- Operating states
- S I S C
- Plants in the decommissioning stage
- Juzbado fuel assembly manufacturing facility
- El Cabril radioactive waste disposal facility
- Combustible gastado y residuos alta actividad
- Transport of nuclear material
- Physical protection of nuclear facilities and material
Inspection reports
Published 19/04/18
Inspección para comprobar el estado del programa de OyFH
Inspección para comprobar el estado del programa de OyFH.pdf
Version 1.0 Approved- Document Type
- Basic Document
- Extension
- Size
- 7.3 MB
- Modified
- 22/03/19, 13:49 by Israel Adriel Lampertti
- Created
- 19/04/18, 02:00 by Israel Adriel Lampertti
- Expiration Date
- Never Expire
- Review Date
- Never Review
- Location
- Central nuclear de Trillo
- Description
- AIN/TRI/947/18 - Acta de Inspección - Trillo
- Categories
- Inspección Trillo 2018
Ocurrence Date
19/04/18, 00:00
Publish Date
19/04/18, 00:00
2019-03-21T10:36:18Z
2018-10-24T08:07:53Z
application/pdf
2019-03-21T10:36:18Z
2018-10-24T08:07:53Z
2019-03-21T10:36:18Z
-
Version 1.0By Israel Adriel Lampertti, on 22/03/19, 13:49No Change Log